PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolted column at Derrick -2 Facing North  (800x600).jpg Bolting Derrick -2 Facing North (800x600).jpg Finished compacting along Foundation walls at column line 1 (G.1-E.3) (800x600).jpg Finished compacting around Monumental stair radius Facing West (800x600).jpg Installing shear wall panels at Elev. 7-Stair -4,5 (2nd Floor) Facing South-East (800x600).jpg Installing steel deck angles at Elev. 1,2,3 (2nd Floor) Facing South-East (800x600).jpg Installing the Shear wall panels at Elev. 7-Stair -4,5 Facing North-East (800x600).jpg Steel angles for the metal deck (3rd Floor) at Elev. 4,5 Facing East (800x600).jpg Backfill and compact inside Stair -2 Facing West(800x600).jpg
Previous pageNext page Installing shear wall panels at Elev. 7-Stair -4,5 (2nd Floor) Facing South-East (800x600)
Installing shear wall panels at Elev. 7-Stair -4,5 (2nd Floor) Facing South-East (800x600)